Bahrain Yellow Pages Online
Tianjin Dalipu Oil Country Tubular Goods Co., Ltd

Tianjin Dalipu Oil Country Tubular Goods Co., Ltd - | E-Showroom

Home » Products »  alloy metal tubing steel pipe manufacturer

alloy metal tubing steel pipe manufacturer

Add Review
Price : USD 600



 alloy metal tubing steel pipe manufacturer
Size(O.D)
25-356mm
Wall thickness
4-70mm
Length
1m-12m ,by customer’s requirements
Materials
 #10 #20 #45 16Mn ,37Mn5,27SiMn,CrMo,40Cr
Technique
cold rolled/drown
Usage
Low and middle pressure fluid pipeline, boiler, petroleum and natural gas industry, drilling, chemical industry, electric industry, shipbuilding, fertilizer equipment and pipeline, structure, petrochemical, pharmaceutical industry
Surface
Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,etc.
Ends
1. Plain 2. Beveled3. Thread with Coupling or cap
End protector
1. Plastic pipe cap2. Iron protector
Packing
Plastic caps on both ends, Steel bundle, Woven bag or acc. to customers' request
Delivery Detail:
10-30days after receiving the prepayment 1) Container2) Bulk carrier
Certificate
ISO9001, SGS,BV, etc
FAQ
Q: How long is your delivery time?A: If there are stocks, take 5-10days to delivery for small quantity, and 30-40days for bigger quantity;If no stock, depends on the steel billet purchase,Q: What about your payment term?A: Usually T/T or L/C, 30% deposit and 70% before delivery.Q: what about your standard delivery dateA: 30 days after receiving deposit .We are pleased to provide you with best services in consulting, purchasing,transportation, installation, and after-sales services.

We would like to establish  long term business with  any reliable partner in the world . Any interesting or questions, pls don't  hesitate to contace us . Waiting for your kindly reply . Thanks 

  • Product Details
  • Brand :
  • Place of Origin : TIANJIN
  • FOB Price : USD 600
  • Minimum Order Quantity : 1 tons
  • Supply Ability :
  • Packaging & Delivery
  • Packaging Detail : casing steel pipe ,black painting, plastic caps on both ends, according to customer's requirements.
  • Delivery Detail : Shipped in 10 days after payment
4-1/2"